Civil construction support for Busselton developers and contractors
Developers and contractors in Busselton, Vasse, Dunsborough and Yallingup use Project Prime for subdivision support, as-constructed handover, drone progress surveys and quantity checks. We work from our Bunbury office, a short drive down the coast, and much of the checking is done from the records you send.
Subdivision support from site review to handover
A subdivision brings together a developer, a civil contractor, consultants and several authorities, and the numbers drift between them. We work with developers from early site review through pre-calculation plans, tender and construction controls to final handover, keeping one set of quantities and records that everyone can trace.
A current action and risk register shows what is still open at each stage, so a decision is not held up by a question nobody owned.
Planning approvals, cadastral certification and legal advice stay with the authorities and the professionals you appoint. We coordinate the information around them.
As-constructed handover for Busselton works
Water Corporation publishes its own rules for as-constructed information. Its Developers Manual asks for the completed, signed plan to be submitted through its website within eight weeks of a successful final takeover inspection, and its WCX CAD Standard sets the drawing conventions. We prepare water and sewer packages with those documents beside us.
Road and drainage data goes to the local government, and what it needs is set by the receiving authority’s requirements for your project. We confirm them with you at the start, then prepare the package and keep a register of each submission and response.
Drone progress surveys for monthly claims
Contractors working in Busselton can have a site flown on the dates their claims fall due. You get a dated aerial record, measured volumes or progress quantities, and a comparison against earlier surveys in a browser portal. Earlier surveys stay alongside the latest, so change over time is visible to your project manager.
Flights depend on weather, airspace and site access, so we agree extents, dates and cut-offs before the first one.
Quantity checks before you commit
A second take-off on a tender or live job shows where your numbers and ours differ, and why. Each difference is tied to a drawing reference, so your estimator can decide what to query. On a live contract we also measure changed scope against the drawings, so variations are written up while site records are current.
Checks like these are done from the files you send, so distance from Bunbury is no obstacle. When a site visit helps, we are about 53 km away by road, usually a drive of 35 to 45 minutes.
What we do in Busselton
- Land development support
One team keeping quantities, approvals tracking and records straight from site review to handover.
- Water Corporation handover (WCX)
Water and sewer packages prepared for submission after the final takeover inspection.
- Council as-builts (R-Spec & D-Spec)
Road and drainage data prepared for the local government receiving the assets.
- Drone progress surveys
Measured progress on subdivision and civil sites, timed to your claim dates.
- Quantity & estimating checks
An independent check on take-offs for work priced out of town.
How we work.
Send what you have.
Drawings, models, site records, the tender package. We start from your files, at whatever stage the job is at.
We confirm scope, fee and turnaround.
Before any work starts you know what we will do, what it costs and when you will have it.
You get the checked result, with its workings.
Every figure comes with how we got it, so your team can check it and use it. Bring us in for one task or for ongoing support.
Where we work.
Based in Bunbury and working across South West WA, on civil jobs from Harvey and Collie down to Busselton, Dunsborough and Margaret River.
- Bunbury
- Busselton
- Australind
- Eaton
- Capel
- Dunsborough
- Harvey
- Collie
- Margaret River
Questions.
Do you work in Busselton if you are based in Bunbury?
Yes. We are a short drive down the coast, about 53 km by road, and most of what we do is prepared from your drawings and records. We visit when a task needs it, such as drone flights or capturing as-constructed information.
Can you help with a subdivision in Busselton or Vasse?
Yes. We support developers from site and purchase review through pre-calculation plans, tender, construction controls and handover. Approvals, cadastral certification and legal advice remain with the authorities and your appointed professionals, and their fees are separate.
What does Water Corporation need at handover?
Its Developers Manual says the signed as-constructed plan is submitted through its website within eight weeks of a successful final takeover inspection, using its WCX drawing standard. Check the current version for your job. We prepare the package against it.
Can you survey progress for contractors in Dunsborough and Yallingup?
Yes. We fly drone progress surveys on the dates your claims fall due and report volumes or quantities against the agreed surface. We confirm site access, extents and cut-off dates before the first flight, and the fee before any work starts.
Tell us about the job in Busselton.
Send what you have. We’ll confirm the scope, fee and turnaround before we start.